Umlauf am 14. 12.: | TS 605 (640) | TS 606 (640) | TS 607 (650) | Datum | 1. Tag | 2. Tag | 3. Tag | 1. Tag | 1. Tag | 2. Tag |
---|---|---|---|---|---|---|---|
- | - | - | - | - | - | ||
Fr 1. 3. | 640.007 | 640.006 | 640.004 | 650.006 | 650.005 | Fr 1. 3. | |
Sa 2. 3. | Sa 2. 3. | ||||||
So 3. 3. | So 3. 3. | ||||||
Mo 4. 3. | 640.007 | 640.006 | 640.004 | 560.003 + 560.004 | 650.006 650.005 [1] | 650.005 [2] | Mo 4. 3. |
Di 5. 3. | 640.005 | 640.006 | Di 5. 3. | ||||
Mi 6. 3. | 640.006 | 640.005 | 640.007 | 640.004 | 650.005 | Mi 6. 3. | |
Do 7. 3. | 640.007 | 650.005 | Do 7. 3. | ||||
Fr 8. 3. | 640.005 | 640.007 | 640.006 | 640.004 | 650.005 | 650.006 | Fr 8. 3. |
Sa 9. 3. | 640.006 | 640.005 | 640.007 | 640.004 | 650.006 | 650.005 | Sa 9. 3. |
So 10. 3. | 640.007 242.264 + 961.021 Sl [3] | 640.006 | 640.005 | 640.004 | 650.005 | So 10. 3. | |
Mo 11. 3. | 640.005 | 640.006 | 560.027 + 560.024 [4] | 650.005 | Mo 11. 3. | ||
Di 12. 3. | 640.004 | 640.005 | 640.007 | 242.264 + 961.021 Sl | 650.005 | 650.006 | Di 12. 3. |
Mi 13. 3. | 640.004 | 640.006 | 650.006 | Mi 13. 3. | |||
Do 14. 3. | 640.005 | 640.007 | 640.004 [5] | 640.004 [6] | Do 14. 3. | ||
Fr 15. 3. | 640.004 | 640.007 | 640.006 | Fr 15. 3. | |||
Sa 16. 3. | Sa 16. 3. | ||||||
So 17. 3. | 640.005 | 640.008 | 640.006 | So 17. 3. | |||
Mo 18. 3. | 640.007 | 640.008 | 640.006 | 650.006 | Mo 18. 3. | ||
Di 19. 3. | 640.008 | 650.005 | Di 19. 3. | ||||
Mi 20. 3. | 640.005 | 640.008 | 650.006 640.007 [7] | 650.005 | Mi 20. 3. | ||
Do 21. 3. | 640.004 | 640.005 | 640.008 | 640.007 | 650.006 | 650.005 | Do 21. 3. |
Fr 22. 3. | 640.004 | 650.005 | Fr 22. 3. | ||||
Sa 23. 3. | 640.005 | 640.008 | 640.004 | 640.007 | 650.006 | 650.005 | Sa 23. 3. |
So 24. 3. | 640.004 | 640.005 | 640.008 | 650.005 | 650.006 | So 24. 3. | |
Mo 25. 3. | 640.008 | 640.007 | 650.005 | Mo 25. 3. | |||
Di 26. 3. | 640.007 | Di 26. 3. | |||||
Mi 27. 3. | 640.006 | 640.008 | 640.007 640.005 [8] | 650.006 | Mi 27. 3. | ||
Do 28. 3. | 640.008 | 640.005 | 650.006 | Do 28. 3. | |||
Fr 29. 3. | 640.006 [9] | 640.008 | 640.005 | 640.006 650.006 [10] | 650.005 | Fr 29. 3. | |
Sa 30. 3. | 640.005 | Sa 30. 3. | |||||
So 31. 3. | 640.008 | So 31. 3. | |||||
Umlauf am 14. 12.: | - | - | - | - | - | - | Datum |
1. Tag | 2. Tag | 3. Tag | 1. Tag | 1. Tag | 2. Tag | ||
TS 605 (640) | TS 606 (640) | TS 607 (650) |
[1] | Zug 4703: 650.006 Zug 4728: 650.005 |
[2] | Zug 4709: 650.005 |
[3] | Zug 14140: 640.007 Zug 4724: 242.264 + 961.021 Sl |
[4] | Zug 4051: 560.027 + 560.024 |
[5] | Zug 4006: 640.004 |
[6] | Zug 4042: 640.004 |
[7] | Zug 14102: 650.006 Zug 4056: 640.007 |
[8] | Züge 4045, 14102: 640.007 Zug 4057: 640.005 |
[9] | Züge 14104, 4733: 640.006 |
[10] | Zug 4713: 640.006 Zug 4728: 650.006 |