Umlauf am 14. 12.: | TS 605 (640) | TS 606 (640) | TS 607 (650) | Datum | 1. Tag | 2. Tag | 3. Tag | 1. Tag | 1. Tag | 2. Tag |
---|---|---|---|---|---|---|---|
- | - | - | - | - | - | ||
Do 1. 8. | 640.008 | 640.007 | 650.006 | Do 1. 8. | |||
Fr 2. 8. | 640.008 | 640.007 | 650.005 | 650.006 | Fr 2. 8. | ||
Sa 3. 8. | 640.004 | 640.007 660.003 [1] | 650.006 | Sa 3. 8. | |||
So 4. 8. | 640.005 | 640.008 | 640.006 | 640.007 | 650.005 | 650.006 | So 4. 8. |
Mo 5. 8. | 640.005 [2] | 640.005 640.004 [3] | 640.008 | 640.007 | 650.006 | 650.005 | Mo 5. 8. |
Di 6. 8. | 640.008 [4] | 640.005 | 640.004 | 650.005 | 650.006 | Di 6. 8. | |
Mi 7. 8. | 640.008 | 640.005 | 640.007 | 650.006 | 650.005 | Mi 7. 8. | |
Do 8. 8. | 640.004 | 640.008 | 640.007 | 650.005 | Do 8. 8. | ||
Fr 9. 8. | 640.007 | 560.027 + 560.024 [5] | 650.005 | Fr 9. 8. | |||
Sa 10. 8. | 640.007 | Sa 10. 8. | |||||
So 11. 8. | So 11. 8. | ||||||
Mo 12. 8. | 640.007 | 640.004 | 640.005 | 650.006 | 650.005 | Mo 12. 8. | |
Di 13. 8. | 640.007 | 640.005 640.006 [6] | 640.005 [7] | 650.005 | 650.006 | Di 13. 8. | |
Mi 14. 8. | 640.007 | 640.006 | 640.005 | 650.006 | 650.005 | Mi 14. 8. | |
Do 15. 8. | 640.006 | 640.005 | Do 15. 8. | ||||
Fr 16. 8. | 640.006 | 640.004 | 650.006 | Fr 16. 8. | |||
Sa 17. 8. | 640.008 | 640.005 | 640.006 | 640.007 | 650.005 | 650.006 | Sa 17. 8. |
So 18. 8. | 640.007 | 640.008 | 650.005 | So 18. 8. | |||
Mo 19. 8. | 640.008 | 650.005 | Mo 19. 8. | ||||
Di 20. 8. | 640.007 | 640.006 | 650.005 | Di 20. 8. | |||
Mi 21. 8. | 640.006 | 660.004 | Mi 21. 8. | ||||
Do 22. 8. | 640.007 | 640.008 | 660.004 | 650.006 | 650.005 | Do 22. 8. | |
Fr 23. 8. | 640.006 | 640.007 | 660.004 [8] | 650.005 | 650.006 | Fr 23. 8. | |
Sa 24. 8. | 640.008 | 640.006 | 242.242 + 961.021 Sl | Sa 24. 8. | |||
So 25. 8. | 640.006 | 640.007 | 640.008 | 640.004 [9] | 650.005 | 650.006 | So 25. 8. |
Mo 26. 8. | 640.007 | 650.005 | Mo 26. 8. | ||||
Di 27. 8. | 640.008 | 640.006 | 650.005 | 650.006 | Di 27. 8. | ||
Mi 28. 8. | 640.004 [10] | 650.005 | Mi 28. 8. | ||||
Do 29. 8. | 640.008 | 640.004 | 650.006 | Do 29. 8. | |||
Fr 30. 8. | 640.008 640.007 [11] | 640.004 | 640.006 | 660.004 [12] | 650.006 | Fr 30. 8. | |
Sa 31. 8. | 640.006 | 640.007 | Sa 31. 8. | ||||
Umlauf am 14. 12.: | - | - | - | - | - | - | Datum |
1. Tag | 2. Tag | 3. Tag | 1. Tag | 1. Tag | 2. Tag | ||
TS 605 (640) | TS 606 (640) | TS 607 (650) |
[1] | Zug 4707: 640.007 Zug 4716: 660.003 |
[2] | Zug 4733: 640.005 |
[3] | Zug 4703: 640.005 Zug 4753: 640.004 |
[4] | Zug 4724: 640.008 |
[5] | Zug 4006: 560.027 + 560.024 |
[6] | Zug 4713: 640.005 Zug 4728: 640.006 |
[7] | Zug 14102: 640.005 |
[8] | Zug 14102: 660.004 |
[9] | Zug 4712: 640.004 |
[10] | Zug 4062: 640.004 |
[11] | Zug 4011: 640.008 Zug 14122: 640.007 |
[12] | Zug 4041: 660.004 |