Umlauf am 10. 12.: | TS 885 (812) | TS 895 (812) | Datum | 1. Tag | 2. Tag | 1. Tag |
---|---|---|---|---|
9000pk/9003/9004 /9009/9012/9015 /9016/9019/9020 /9023/9024/9027 /9028/9033/9034 /9093 | 9000/9005/9022 | 8551/8500pk /8507pk/8512 | ||
Fr 1. 4. | 812.055 | Fr 1. 4. | ||
Sa 2. 4. | 812.036 | Sa 2. 4. | ||
So 3. 4. | 812.036 | So 3. 4. | ||
Mo 4. 4. | 812.036 | Mo 4. 4. | ||
Di 5. 4. | Di 5. 4. | |||
Mi 6. 4. | Mi 6. 4. | |||
Do 7. 4. | Do 7. 4. | |||
Fr 8. 4. | Fr 8. 4. | |||
Sa 9. 4. | Sa 9. 4. | |||
So 10. 4. | So 10. 4. | |||
Mo 11. 4. | Mo 11. 4. | |||
Di 12. 4. | 812.036 | Di 12. 4. | ||
Mi 13. 4. | 812.036 | Mi 13. 4. | ||
Do 14. 4. | 812.036 | Do 14. 4. | ||
Fr 15. 4. | 812.036 | Fr 15. 4. | ||
Sa 16. 4. | 812.036 | Sa 16. 4. | ||
So 17. 4. | 812.032 | So 17. 4. | ||
Mo 18. 4. | 812.032 | Mo 18. 4. | ||
Di 19. 4. | 812.032 | Di 19. 4. | ||
Mi 20. 4. | 812.035 + 812.024 Sl | 812.039 + 812.060 Sl 812.060 + 812.039 Sl [1] | 812.032 | Mi 20. 4. |
Do 21. 4. | Do 21. 4. | |||
Fr 22. 4. | 812.032 | Fr 22. 4. | ||
Sa 23. 4. | 812.032 | Sa 23. 4. | ||
So 24. 4. | 812.032 | So 24. 4. | ||
Mo 25. 4. | 812.039 + 812.042 Sl | 812.036 + 812.035 Sl | 812.032 | Mo 25. 4. |
Di 26. 4. | Di 26. 4. | |||
Mi 27. 4. | Mi 27. 4. | |||
Do 28. 4. | Do 28. 4. | |||
Fr 29. 4. | Fr 29. 4. | |||
Sa 30. 4. | Sa 30. 4. | |||
Umlauf am 10. 12.: | 9000pk/9003/9004 /9009/9012/9015 /9016/9019/9020 /9023/9024/9027 /9028/9033/9034 /9093 | 9000/9005/9022 | 8551/8500pk /8507pk/8512 | Datum |
1. Tag | 2. Tag | 1. Tag | ||
TS 885 (812) | TS 895 (812) |
[1] | Züge 9000, 9005, 9022: 812.039 + 812.060 Sl Zug 9025: 812.060 + 812.039 Sl |