Umlauf am 14. 12.: | TS 601 (680) | TS 602 (680) | Datum | 1. Tag | 1. Tag | 2. Tag | 3. Tag | 4. Tag | 5. Tag |
---|---|---|---|---|---|---|---|
241/240 | 242/243 | 512/515 | 516/507/504 | 505/506/517 | 509/500 | ||
So 1. 9. | 680.007 | 680.002 | 680.003 | 680.005 | 680.006 | 680.001 | So 1. 9. |
Mo 2. 9. | 680.001 | 680.007 | 680.002 | 680.003 | 680.005 | 680.006 | Mo 2. 9. |
Di 3. 9. | 680.001 | 680.006 | 680.007 | 680.002 | 680.003 | 680.005 | Di 3. 9. |
Mi 4. 9. | 680.001 | 680.005 | 680.006 | 680.007 | 680.002 | 680.003 | Mi 4. 9. |
Do 5. 9. | 680.001 | 680.003 | 680.005 | 680.006 | 680.007 | 680.002 | Do 5. 9. |
Fr 6. 9. | 680.001 | 680.002 | 680.003 | 680.005 | 680.006 | 680.007 | Fr 6. 9. |
Sa 7. 9. | 680.001 | 680.002 | 680.006 [1] | 680.003 | 680.005 | 680.006 [2] | Sa 7. 9. |
So 8. 9. | 680.001 | 680.007 | 680.002 | 680.006 | 680.003 | 680.005 | So 8. 9. |
Mo 9. 9. | 680.001 | 680.005 | 680.007 | 680.002 | 680.006 | 680.003 | Mo 9. 9. |
Di 10. 9. | 680.001 | 680.003 | 680.005 | 680.007 | 680.002 | 680.006 | Di 10. 9. |
Mi 11. 9. | 680.001 | 680.006 | 680.003 | 680.005 | 680.007 | 680.002 | Mi 11. 9. |
Do 12. 9. | 680.002 | 680.001 | 680.006 | 680.003 | 680.005 | 680.007 | Do 12. 9. |
Fr 13. 9. | 680.002 | 680.007 | 680.001 | 680.006 | 680.003 | 680.005 | Fr 13. 9. |
Sa 14. 9. | 680.002 | 680.007 | 680.003 | 680.001 | 680.006 | 680.005 | Sa 14. 9. |
So 15. 9. | 680.002 | 680.005 | 680.007 | 680.003 | 680.001 | 680.006 | So 15. 9. |
Mo 16. 9. | 680.002 | 680.006 | 680.005 | 680.007 | 680.003 | 680.001 | Mo 16. 9. |
Di 17. 9. | 680.002 | 680.001 | 680.006 | 680.005 | 680.007 | 680.003 | Di 17. 9. |
Mi 18. 9. | 680.002 | 680.003 | 680.001 | 680.006 | 680.005 | 680.007 | Mi 18. 9. |
Do 19. 9. | 680.002 | 680.007 | 680.003 | 680.001 | 680.006 | 680.005 | Do 19. 9. |
Fr 20. 9. | 680.002 | 680.005 | 680.007 | 680.003 | 680.001 | 680.006 | Fr 20. 9. |
Sa 21. 9. | 680.002 | 680.005 | 680.001 | 680.007 | 680.006 Vl + 680.003 680.006 [3] | 680.003 [4] | Sa 21. 9. |
So 22. 9. | 680.003 | 680.002 | 680.005 | 680.001 | 680.007 | 680.006 | So 22. 9. |
Mo 23. 9. | 680.003 | 680.006 | 680.002 | 680.005 | 680.001 | 680.007 | Mo 23. 9. |
Di 24. 9. | 680.003 | 680.007 | 680.006 | 680.002 | 680.005 | 680.001 | Di 24. 9. |
Mi 25. 9. | 680.003 | 680.001 | 680.007 | 680.006 | 680.002 | 680.005 | Mi 25. 9. |
Do 26. 9. | 680.003 | 680.005 | 680.001 | 680.007 | 680.006 | 680.002 | Do 26. 9. |
Fr 27. 9. | 680.003 | 680.002 | 680.005 | 680.001 | 680.007 | 680.006 1216.228 + 981.001 Sl [5] | Fr 27. 9. |
Sa 28. 9. | 680.003 | 680.002 | 680.007 | 680.005 | 680.001 | 680.006 | Sa 28. 9. |
So 29. 9. | 680.006 | 680.003 | 680.002 | 680.007 | 680.005 | 680.001 | So 29. 9. |
Mo 30. 9. | 680.006 | 680.001 | 680.003 [6] | 680.002 | 680.007 680.003 [7] | 680.005 | Mo 30. 9. |
Umlauf am 14. 12.: | 241/240 | 242/243 | 512/515 | 516/507/504 | 505/506/517 | 509/500 | Datum |
1. Tag | 1. Tag | 2. Tag | 3. Tag | 4. Tag | 5. Tag | ||
TS 601 (680) | TS 602 (680) |
[1] | Zug 512: 680.006 |
[2] | Zug 500: 680.006 |
[3] | Zug 505: 680.006 Vl + 680.003, pozn: V Praze hl.n. přestup do jiné soupravy Zug 506: 680.006 |
[4] | Zug 509: 680.003 |
[5] | Zug 510: 680.006 Zug 509: 1216.228 + 981.001 Sl |
[6] | Zug 515: 680.003 |
[7] | Zug 506: 680.007 Zug 517: 680.003 |