obeh pre 8. 12.: | TS 641 (680) | TS 642 (680) | TS 643 (680) | dátum | 1. deň | 1. deň | 2. deň | 1. deň | 2. deň |
---|---|---|---|---|---|---|
241/240 | 510/509/502 | 512/515 | 516/507/504 | 505/506/517 | ||
ne 1. 4. | 680.004 | 680.001 | 680.003 | ne 1. 4. | ||
po 2. 4. | 680.004 | 680.003 | 680.001 | 680.005 | 680.007 | po 2. 4. |
ut 3. 4. | 680.004 | 680.001 | 680.003 | 680.007 | 680.005 | ut 3. 4. |
st 4. 4. | 680.004 | 680.001 | 680.003 | 680.005 | 680.007 | st 4. 4. |
št 5. 4. | 680.004 | 680.003 | 680.001 | 680.007 | 680.005 | št 5. 4. |
pi 6. 4. | 680.004 | 680.001 | 680.003 | 680.007 | pi 6. 4. | |
so 7. 4. | 680.004 | 680.003 | 680.001 | 680.005 | so 7. 4. | |
ne 8. 4. | 680.004 | 680.005 | ne 8. 4. | |||
po 9. 4. | 680.004 | 680.005 | po 9. 4. | |||
ut 10. 4. | 680.004 | 680.003 | 680.001 | 680.005 | 680.007 | ut 10. 4. |
st 11. 4. | 680.004 | 151.019 680.003 [1] | 680.007 | 680.001 | 680.005 | st 11. 4. |
št 12. 4. | 680.004 | 680.007 | 680.003 | 680.005 | 680.001 | št 12. 4. |
pi 13. 4. | 680.004 | 680.002 | 680.001 | 680.007 | 680.005 | pi 13. 4. |
so 14. 4. | 680.004 | 680.005 | 680.002 | 680.001 | 680.007 | so 14. 4. |
ne 15. 4. | 680.005 | 680.004 | 680.002 | 680.007 | 680.001 | ne 15. 4. |
po 16. 4. | 680.005 | 680.002 | 680.004 | 680.001 | 680.007 | po 16. 4. |
ut 17. 4. | 680.005 | 680.004 | 680.002 | 680.007 | 680.001 | ut 17. 4. |
st 18. 4. | 680.005 | 680.004 | 680.002 | 680.001 | 680.007 | st 18. 4. |
št 19. 4. | 680.005 | 680.002 | 680.004 | 680.007 | 680.001 | št 19. 4. |
pi 20. 4. | 680.005 | 680.004 | 680.001 | 680.002 | 680.007 | pi 20. 4. |
so 21. 4. | 680.005 | 680.001 | 680.004 | 680.007 | 680.002 | so 21. 4. |
ne 22. 4. | 680.001 | 680.005 | 680.004 | 680.002 | 680.007 | ne 22. 4. |
po 23. 4. | 680.001 | 680.004 | 680.007 | 680.005 | 680.002 | po 23. 4. |
ut 24. 4. | 680.001 | 680.007 | 680.004 | 680.002 | 680.005 | ut 24. 4. |
st 25. 4. | 680.001 | 680.007 | 680.004 | 680.005 | 680.002 | st 25. 4. |
št 26. 4. | 680.001 | 680.004 | 680.007 | 680.002 | 680.005 | št 26. 4. |
pi 27. 4. | 680.001 | 680.007 | 680.004 | 680.005 | 680.002 | pi 27. 4. |
so 28. 4. | 680.002 | 680.005 | so 28. 4. | |||
ne 29. 4. | 680.005 | 680.002 | ne 29. 4. | |||
po 30. 4. | 680.007 | 680.004 | 680.001 | 680.002 | 680.005 | po 30. 4. |
obeh pre 8. 12.: | 241/240 | 510/509/502 | 512/515 | 516/507/504 | 505/506/517 | dátum |
1. deň | 1. deň | 2. deň | 1. deň | 2. deň | ||
TS 641 (680) | TS 642 (680) | TS 643 (680) |
[1] | vlak 510: 151.019 vlak 511: 680.003 |