Umlauf am 14. 12.: | TS 601 (680) | TS 602 (680) | Datum | 1. Tag | 1. Tag | 2. Tag | 3. Tag | 4. Tag | 5. Tag |
---|---|---|---|---|---|---|---|
241/240 | 242/243 | 512/515 | 516/507/504 | 505/506/517 | 509/500 | ||
Do 1. 8. | 680.003 | 680.005 | 680.007 | 680.001 | 680.006 | 680.004 | Do 1. 8. |
Fr 2. 8. | 680.003 | 680.004 | 680.005 | 680.007 | 680.001 | 680.006 | Fr 2. 8. |
Sa 3. 8. | 680.003 | 680.004 | 680.001 | 680.005 | 680.007 | 680.006 | Sa 3. 8. |
So 4. 8. | 680.003 | 680.006 | 680.004 | 680.001 | 680.005 | 680.007 | So 4. 8. |
Mo 5. 8. | 680.003 | 680.007 | 680.006 | 680.004 | 680.001 | 680.005 | Mo 5. 8. |
Di 6. 8. | 680.003 | 680.005 | 680.007 | 680.006 | 680.004 | 680.001 | Di 6. 8. |
Mi 7. 8. | 680.003 | 680.001 | 680.005 | 680.007 | 680.006 | 680.004 | Mi 7. 8. |
Do 8. 8. | 680.003 | 680.004 | 680.001 | 680.005 | 680.007 | 680.006 | Do 8. 8. |
Fr 9. 8. | 680.006 | 680.003 | 680.004 | 680.001 | 680.005 | 680.007 | Fr 9. 8. |
Sa 10. 8. | 680.006 | 680.003 | 680.005 | 680.004 680.002 [1] | 680.001 | 680.007 | Sa 10. 8. |
So 11. 8. | 680.006 | 680.007 | 680.003 | 680.005 | 680.002 | 680.001 | So 11. 8. |
Mo 12. 8. | 680.006 | 680.001 | 680.007 | 680.003 | 680.005 | 680.002 | Mo 12. 8. |
Di 13. 8. | 680.006 | 680.002 | 680.001 | 680.007 | 680.003 | 680.005 | Di 13. 8. |
Mi 14. 8. | 680.006 | 680.005 | 680.002 | 680.001 | 680.007 | 680.003 | Mi 14. 8. |
Do 15. 8. | 680.003 | 680.001 [2] | 680.005 | 680.002 | 680.001 + 680.006 Sl 680.006 [3] | 680.007 | Do 15. 8. |
Fr 16. 8. | 680.003 | 680.007 | 680.001 | 680.005 | 680.002 | 680.006 | Fr 16. 8. |
Sa 17. 8. | 680.003 | 680.007 | 680.002 | 680.001 | 680.005 | 680.006 | Sa 17. 8. |
So 18. 8. | 680.003 | 680.006 | 680.007 | 680.002 | 680.001 | 680.005 | So 18. 8. |
Mo 19. 8. | 680.005 | 680.003 | 680.006 | 680.007 | 680.002 | 680.001 | Mo 19. 8. |
Di 20. 8. | 680.005 | 680.001 | 680.003 | 680.006 | 680.007 Sl | 680.002 | Di 20. 8. |
Mi 21. 8. | 680.005 | 680.002 | 680.001 | 680.003 | 680.006 | 680.007 | Mi 21. 8. |
Do 22. 8. | 680.005 | 680.007 | 680.002 | 680.001 | 680.003 | 680.006 | Do 22. 8. |
Fr 23. 8. | 680.005 | 680.006 | 680.007 | 680.002 | 680.001 | 680.003 | Fr 23. 8. |
Sa 24. 8. | 680.005 | 680.006 | 680.001 | 680.007 | 680.002 | 680.003 | Sa 24. 8. |
So 25. 8. | 680.005 | 680.003 | 680.006 | 680.001 | 680.007 | 680.002 | So 25. 8. |
Mo 26. 8. | 680.005 | 680.002 | 680.003 | 680.006 | 680.001 | 680.007 | Mo 26. 8. |
Di 27. 8. | 680.007 | 680.005 | 680.002 | 680.003 | 680.006 | 680.001 | Di 27. 8. |
Mi 28. 8. | 680.007 | 680.001 | 680.005 | 680.002 | 680.003 | 680.006 | Mi 28. 8. |
Do 29. 8. | 680.007 | 680.006 | 680.001 | 680.005 | 680.002 | 680.003 | Do 29. 8. |
Fr 30. 8. | 680.007 | 680.003 | 680.006 | 680.001 | 680.005 | 680.002 | Fr 30. 8. |
Sa 31. 8. | 680.007 | 680.003 | 680.005 | 680.006 | 680.001 | 680.002 | Sa 31. 8. |
Umlauf am 14. 12.: | 241/240 | 242/243 | 512/515 | 516/507/504 | 505/506/517 | 509/500 | Datum |
1. Tag | 1. Tag | 2. Tag | 3. Tag | 4. Tag | 5. Tag | ||
TS 601 (680) | TS 602 (680) |
[1] | Zug 516: 680.004 Zug 507: 680.002 |
[2] | Zug 243: 680.001 |
[3] | Zug 505: 680.001 + 680.006 Sl, pozn: Na hlaváku výměna souprav Zug 506: 680.006 |