obeh pre 14. 12.: | TS 601 (680) | TS 602 (680) | dátum | 1. deň | 1. deň | 2. deň | 3. deň | 4. deň | 5. deň |
---|---|---|---|---|---|---|---|
241/240 | 242/243 | 512/515 | 516/507/504 | 505/506/517 | 509/500 | ||
ne 1. 12. | 680.007 | 680.004 | 680.001 | 680.006 | 680.005 | 680.003 | ne 1. 12. |
po 2. 12. | 680.007 | 680.003 | 680.004 | 680.001 | 680.006 | 680.005 | po 2. 12. |
ut 3. 12. | 680.007 | 680.005 | 680.003 | 680.004 | 680.001 | 680.006 | ut 3. 12. |
st 4. 12. | 680.006 | 680.007 | 680.005 | 680.003 | 680.004 | 680.001 | st 4. 12. |
št 5. 12. | 680.001 | 680.006 | 680.007 | 680.005 | 680.003 | 680.004 | št 5. 12. |
pi 6. 12. | 680.001 | 680.004 | 680.006 | 680.007 | 680.005 | 680.003 | pi 6. 12. |
so 7. 12. | 680.001 | 680.004 | 680.005 | 680.006 | 680.007 | 680.003 | so 7. 12. |
ne 8. 12. | 680.001 | 680.003 | 680.004 | 680.005 | 680.006 | 680.007 | ne 8. 12. |
po 9. 12. | 680.001 | 680.007 | 680.003 | 680.004 | 680.005 | 680.006 | po 9. 12. |
ut 10. 12. | 680.001 | 680.006 | 680.007 | 680.003 | 680.004 | 680.005 | ut 10. 12. |
st 11. 12. | 680.001 | 680.005 | 680.006 | 680.007 | 680.003 | 680.004 | st 11. 12. |
št 12. 12. | 680.004 | 680.001 | 680.005 | 680.006 | 680.007 | 680.003 | št 12. 12. |
pi 13. 12. | 680.004 | 680.003 | 680.001 | 680.005 | 680.006 | 680.007 | pi 13. 12. |
so 14. 12. | 680.004 | 680.003 | 680.006 | 680.001 | 680.005 | 680.007 | so 14. 12. |
obeh pre 14. 12.: | 241/240 | 242/243 | 512/515 | 516/507/504 | 505/506/517 | 509/500 | dátum |
1. deň | 1. deň | 2. deň | 3. deň | 4. deň | 5. deň | ||
TS 601 (680) | TS 602 (680) |